Protecting coastal waters, relieving infrastructure.

Untreated wastewater is putting growing pressure on Tenerife's coasts — and with them the island's most important economic area. That is exactly where KaiSo starts, with waste heat from servers driving the treatment.

System developer: KaiSo · KaiSo.works UG

YOU ARE READING THIS AS —

IN MOTION

The cycle in about three minutes

The film only starts when you click it, and stays silent until then. For now the film is in German — both the on-screen text and the narration. The English version follows.

THE ISLAND'S PROBLEM

The island's acute problem is its wastewater

On a volcanic island, what a data centre throws off is scarce: energy, water, fertile soil. The most urgent of all, though, is what flows back — municipal wastewater that reaches the sea through existing outfalls.

PRIMARY · MUNICIPAL WASTEWATER

  • The coast is an economic area, not just an environment

    Every day, untreated wastewater flows into the sea through existing pipes. This is not a distant environmental issue: it affects the beaches and with them the economic foundation of the island.

    The waste heat from the servers is warm enough to treat this wastewater — without drawing electricity from the island grid to do it. The hub connects for this as a decentralised offtaker directly to the existing sewer network or pumping station.

SEPARATE FROM THAT · DRINKING WATER FROM THE SEA

The two figures below describe the existing drinking water supply of the Canary Islands. They do not belong to the wastewater, and they do not describe the capacity of this plant.

  • 550,000 m³SEAWATER DESALINATION IN THE CANARY ISLANDS, PER DAYTHE ISLAND'S EXISTING LOAD, NOT THE CAPACITY OF THIS PLANT

    Drinking water comes from the sea

    The Canary Islands run around 28 large desalination plants with roughly 550,000 cubic metres a day. On Fuerteventura, practically all drinking water comes from seawater desalination.

    The same plant can treat seawater just as well. For Tenerife that is the secondary line — the focus is on the wastewater.

  • 4–4.5 kWhOF ELECTRICITY FOR ONE CUBIC METREOLDER PLANTS IN THE CANARY ISLANDS

    This water is an electricity bill first

    Older plants in the Canary Islands need 4 to 4.5 kilowatt hours of electricity for one cubic metre — from a fossil-fuelled island grid.

    That is why, in the Canary Islands, water is always an energy question too.

FURTHER BOTTLENECKS ON THE ISLAND

  • 0 kWhDRAWN BY THE HUB FROM THE ISLAND GRID

    The island grid is tight and expensive

    On an island, electricity is the bottleneck behind the water. Every additional treatment hangs on the same tight grid.

    The hub draws nothing from that grid. It brings its own electricity with it and relieves the grid instead of loading it further.

  • And the soil has barely any humus

    Volcanic soils are rich in minerals but poor in organic matter. In many places, fertile topsoil is imported. Without organic matter, the soil holds no water.

    This is the smallest of the three bottlenecks — and the one where an additional benefit falls out at the end. More on that further down, at its proper size.

"We are well aware that we cannot filter everything to 100% straight away, but you have to start."
KaiSo Technik

THE IDEA

The waste heat is not waste, it is the drive

AI data centres have three problems: they need more electricity than the grid can deliver. They wait ten years and longer for permits. And they consume cooling water in exactly the places where water is scarce. KaiSo turns that around.

  1. Its own electricity

    Sun, wind, storage — right at the container. No grid connection, no diesel generator, no combustion. The data goes by satellite.

  2. Computing power in a container

    Instead of one large facility, a swarm of ordinary shipping containers. They stand ready in months, not years.

  3. The heat is not lost

    What the servers give off as waste heat is not cooled away but passed on. That is the actual idea.

  4. Wastewater is treated

    The heat drives the treatment of the wastewater. Two waste streams — heat and dirty water — become one cycle.

Computing power earns the money, water and soil are the benefit for the island. The site carries itself on the computing power — everything else improves the balance, but does not have to carry it.

ONE PLATFORM, TWO SETTINGS

What comes out depends on what goes in

The plant is neither a sewage works nor a desalination plant. It is a thermodynamic platform: heat drives the treatment. Depending on the medium that goes in, a different raw material comes out.

For Tenerife, setting A comes first: the wastewater is the acute problem. Setting B stays open to the same plant — the same technology, a different medium.

WHY THIS CAN GO QUICKLY

Not a new process, but a connection to existing ones

AN ADDITIONAL BENEFIT, NOT A PROMISE

And soil is created along the way

The waste heat dries and sanitises sewage sludge and supplies its organic structure. Together with recovered nutrients and local volcanic granulate, this produces technically built-up topsoil. The cycle that follows from it is real:

More humusthe soil holds waterless irrigationless desalinationless island electricity

The order of magnitude belongs to the picture: the plant's primary output is clean water. Sludge drying is considerably smaller in volume — a valuable add-on, not a reshaping of the landscape. Anyone expecting whole valleys here is expecting the wrong thing.

WHAT IT MEANS FOR YOU

Four perspectives on the same plant

PERSPECTIVE 01

Government and administration

  • Decentralised infrastructure: the wastewater is treated directly at the bottleneck (point of care), before it reaches the sea. No new central treatment plants required.
  • Water and energy costs fall without the grid having to be expanded.
  • No combustion on site.
  • Eligible for EU co-financing through Interreg-MAC and Spanish water programmes.

PERSPECTIVE 02

Politics

  • Real, regional climate adaptation: cleaner coastal waters, less load on the island grid, benefit that stays on the island.
  • A visible contribution to water, soil and climate.
  • It has to pay for itself and does not live on subsidies.
  • First results in months, not in parliamentary terms.

PERSPECTIVE 03

Business

  • Computing power on site, without waiting for the grid to be expanded.
  • Containers stand ready in months, not years.
  • Local value creation: the simple parts are sourced and built on the island.

PERSPECTIVE 04

Private individuals and agriculture

  • Water that is treated instead of going into the sea unused.
  • Water that does not have to be produced from the island grid.
  • Soil that holds water.
  • Less irrigation for the same result.

WHAT IS HONESTLY OPEN

Four things we are not dressing up

Whoever knows the limits can decide. That is why they stand here and not in the small print.

A SINGLE STEP

Let us talk about a first pilot on Tenerife

This page is meant to make you curious, not to convince you. Anyone who wants to know how it works technically will get that in conversation — under confidentiality, because parts of the process are pending patent application.

teneriffa@kaiso.works

The figures on this page come from the system description of KaiSo Technik, the situation on the ground from reports from the island. What is not in there is not here either.