Untreated wastewater is putting growing pressure on Tenerife's coasts — and with them the island's most important economic area. That is exactly where KaiSo starts, with waste heat from servers driving the treatment.
The film only starts when you click it, and stays silent until then. For now the film is in German — both the on-screen text and the narration. The English version follows.
THE ISLAND'S PROBLEM
The island's acute problem is its wastewater
On a volcanic island, what a data centre throws off is scarce: energy, water, fertile soil. The most urgent of all, though, is what flows back — municipal wastewater that reaches the sea through existing outfalls.
PRIMARY · MUNICIPAL WASTEWATER
The coast is an economic area, not just an environment
Every day, untreated wastewater flows into the sea through existing pipes. This is not a distant environmental issue: it affects the beaches and with them the economic foundation of the island.
The waste heat from the servers is warm enough to treat this wastewater — without drawing electricity from the island grid to do it. The hub connects for this as a decentralised offtaker directly to the existing sewer network or pumping station.
SEPARATE FROM THAT · DRINKING WATER FROM THE SEA
The two figures below describe the existing drinking water supply of the Canary Islands. They do not belong to the wastewater, and they do not describe the capacity of this plant.
550,000 m³SEAWATER DESALINATION IN THE CANARY ISLANDS, PER DAYTHE ISLAND'S EXISTING LOAD, NOT THE CAPACITY OF THIS PLANT
Drinking water comes from the sea
The Canary Islands run around 28 large desalination plants with roughly 550,000 cubic metres a day. On Fuerteventura, practically all drinking water comes from seawater desalination.
The same plant can treat seawater just as well. For Tenerife that is the secondary line — the focus is on the wastewater.
4–4.5 kWhOF ELECTRICITY FOR ONE CUBIC METREOLDER PLANTS IN THE CANARY ISLANDS
This water is an electricity bill first
Older plants in the Canary Islands need 4 to 4.5 kilowatt hours of electricity for one cubic metre — from a fossil-fuelled island grid.
That is why, in the Canary Islands, water is always an energy question too.
FURTHER BOTTLENECKS ON THE ISLAND
0 kWhDRAWN BY THE HUB FROM THE ISLAND GRID
The island grid is tight and expensive
On an island, electricity is the bottleneck behind the water. Every additional treatment hangs on the same tight grid.
The hub draws nothing from that grid. It brings its own electricity with it and relieves the grid instead of loading it further.
And the soil has barely any humus
Volcanic soils are rich in minerals but poor in organic matter. In many places, fertile topsoil is imported. Without organic matter, the soil holds no water.
This is the smallest of the three bottlenecks — and the one where an additional benefit falls out at the end. More on that further down, at its proper size.
"We are well aware that we cannot filter everything to 100% straight away, but you have to start."
KaiSo Technik
THE IDEA
The waste heat is not waste, it is the drive
AI data centres have three problems: they need more electricity than the grid can deliver. They wait ten years and longer for permits. And they consume cooling water in exactly the places where water is scarce. KaiSo turns that around.
Its own electricity
Sun, wind, storage — right at the container. No grid connection, no diesel generator, no combustion. The data goes by satellite.
Computing power in a container
Instead of one large facility, a swarm of ordinary shipping containers. They stand ready in months, not years.
The heat is not lost
What the servers give off as waste heat is not cooled away but passed on. That is the actual idea.
Wastewater is treated
The heat drives the treatment of the wastewater. Two waste streams — heat and dirty water — become one cycle.
Computing power earns the money, water and soil are the benefit for the island. The site carries itself on the computing power — everything else improves the balance, but does not have to carry it.
ONE PLATFORM, TWO SETTINGS
What comes out depends on what goes in
The plant is neither a sewage works nor a desalination plant. It is a thermodynamic platform: heat drives the treatment. Depending on the medium that goes in, a different raw material comes out.
SETTING A · FOCUS TENERIFE
IN
Municipal wastewater
OUT
Clean water
Organic, sanitised sludge — a building block for soil
SETTING B · THE CLASSIC CASE
IN
Seawater
OUT
Clean water
Brine and minerals — salt and magnesium for industrial reuse
For Tenerife, setting A comes first: the wastewater is the acute problem. Setting B stays open to the same plant — the same technology, a different medium.
WHY THIS CAN GO QUICKLY
Not a new process, but a connection to existing ones
Connecting instead of building anew
The hub connects as a decentralised offtaker directly to the existing sewer network or pumping station. No construction of new central treatment plants, no grid expansion procedures.
Containers instead of a building site
Ordinary shipping containers stand ready in months, not years. First results come in months, not in parliamentary terms.
The Canary Islands are EU soil
That opens up Interreg-MAC and Spanish water programmes. The rollout can be co-financed at European level.
AN ADDITIONAL BENEFIT, NOT A PROMISE
And soil is created along the way
The waste heat dries and sanitises sewage sludge and supplies its organic structure. Together with recovered nutrients and local volcanic granulate, this produces technically built-up topsoil. The cycle that follows from it is real:
More humus→the soil holds water→less irrigation→less desalination→less island electricity
The order of magnitude belongs to the picture: the plant's primary output is clean water. Sludge drying is considerably smaller in volume — a valuable add-on, not a reshaping of the landscape. Anyone expecting whole valleys here is expecting the wrong thing.
WHAT IT MEANS FOR YOU
Four perspectives on the same plant
PERSPECTIVE 01
Government and administration
Decentralised infrastructure: the wastewater is treated directly at the bottleneck (point of care), before it reaches the sea. No new central treatment plants required.
Water and energy costs fall without the grid having to be expanded.
No combustion on site.
Eligible for EU co-financing through Interreg-MAC and Spanish water programmes.
PERSPECTIVE 02
Politics
Real, regional climate adaptation: cleaner coastal waters, less load on the island grid, benefit that stays on the island.
A visible contribution to water, soil and climate.
It has to pay for itself and does not live on subsidies.
First results in months, not in parliamentary terms.
PERSPECTIVE 03
Business
Computing power on site, without waiting for the grid to be expanded.
Containers stand ready in months, not years.
Local value creation: the simple parts are sourced and built on the island.
PERSPECTIVE 04
Private individuals and agriculture
Water that is treated instead of going into the sea unused.
Water that does not have to be produced from the island grid.
Soil that holds water.
Less irrigation for the same result.
WHAT IS HONESTLY OPEN
Four things we are not dressing up
Whoever knows the limits can decide. That is why they stand here and not in the small print.
A first pilot does not solve the island's wastewater problem
It starts in one place and shows what it can do. Anything else would be a promise nobody can keep today — and starting is the point all the same.
The system does not produce water without electricity
The pumps need electricity, and nothing about that changes. The difference is that the heat is a waste product — it arises anyway and costs nothing extra.
Dried sewage sludge is not a clean fertiliser
Heavy metals, pharmaceutical residues, PFAS. Whether the organic fraction may go onto a field is decided by contaminant testing. That is a check point, not a revenue point.
Upstream emissions exist
Containers, servers and treatment equipment are manufactured and transported. Those emissions are reported, not defined away.
A SINGLE STEP
Let us talk about a first pilot on Tenerife
This page is meant to make you curious, not to convince you. Anyone who wants to know how it works technically will get that in conversation — under confidentiality, because parts of the process are pending patent application.